Eurex, GE DBoerse T7 Release 15.0 Plans

Updated on: Oct 2, 2026

Latest Event


  • Sep. 2026 Readiness Statement
  • On Sep. 29, 2026, Eurex, GE DBoerse issued Readiness Newsflash | T7 Release 15.0: Readiness Statement is available on publication of Release 15.0 Readiness Statement.
  • For the submission, the dedicated Trading PIN is required, which is available via the Member Section, and this is accessible to central coordinators and their deputies only.
  • Eurex, GE DBoerse also reminded users to participate in simulation environment and connection test to ensure a smooth transition, which are crucial for implementation.
  • Trading participants, Registered independent software vendors (ISVs) and Third party information providers (TPIPs) should submit a Readiness Statement by Oct. 30, 2026.

On May 6, Eurex, GE Dboerse announced the T7 release 15.0 details.

  • Eurex and GE DBoerse released Circular 026/26, and Circular 018/2026 respectively entitled Announcement of T7 Release 15.0, providing details of dates and actions.
  • Release Overview
  • Plans are to introduce T7 Release 15.0 on Nov. 9, 2026 with the Simulation period for T7 Release 15.0 planned to start on Aug. 31, 2026, the circulars providing T7 Trading Participants with the T7 Release 15.0 timeline as well as the communication calendar.
  • Enhancements in T7 Release 15.0, are Xetra Midpoint enhancements, and Sponsored Access Stop Trading Functionality and the Improvements of the Enhanced Drop Copy Interface (EDCI), Off Book Usability Features, plus Flex Instruments for Eurex EnLight.
  • Trading Participants are requested to initiate the preparatory steps to ensure software readiness for the T7 Release 15.0 on Nov. 9, 2026, as with other previous releases.
  • The Communication Calendars list important dates on which documents for T7 Release 15.0 will be published, including existing documents to be revised for T7 Release 15.0.
  • Both Eurex and GE Dboerse have provided these as attachments to their Circulars.
  • All of the detailed preliminary Release Notes listing the functional and various technical enhancements that will be available in T7 Release 15.0, will be provided in Jun. 2026.
  • Eurex and GE Dboerse will provide dedicated Release Simulation environment to give Trading Participants and Independent Software Vendors (ISVs) opportunity to perform comprehensive testing of their trading applications, independent of the T7 Production.
  • In addition to T7 Release Simulation, Trading Participants can use T7 Cloud Simulation to allow Trading Participants and ISVs to test T7 Production and Simulation software.
  • Further details of specific changes applicable to Eurex and GE Dboerse are provided in the Circulars, as well as an additional requirements for each, and the contact points.
  • Jun. 2026 T7 Release 15.0 Requirements
  • On Jun. 16, 2026, Eurex and GE DBoerse published Circulars 037/26 and 027/2026 respectively re MiFID II/MiFIR order flagging requirements related to T7 Release 15.0.
  • Specifically, changes have been made to the Algo ID solution, the Common Upload Engine (CUE) validations for Short Code ID and Algo ID uploads, among other things.
  • This includes the changes enhancing the Short Code ID and Algo ID error reports, which will be introduced with T7 Release 15.0 on Nov. 9, 2026.
  • In addition to these changes, trading participants have been informed by the circulars to include submission of information on substantial updates to their trading algorithms.
  • This includes the annual submission of test documentation on the means of testing.
  • The reports will be available in the simulation environment beginning Aug. 29, 2026.
  • In addition, the information as set out is also required for new trading algorithms.
  • T7 Release 15.0 simulation begins Aug. 31, 2026, and production on Nov. 9, 2026.
  • Aug. 2026 T7 15.0 Simulation Start, Documentation
  • On Aug. 21, 2026, Eurex, GE DBoerse reported T7 Release 15.0: Simulation start and publication of documentation re simulation phase beginning on Aug. 31, 2026.
  • Eurex and GE DBoerse recommended that all trading participants take part in the simulation and to test various scenarios with regard to ensuring readiness.
  • The new documentation can be found on Eurex's and GE DBoerse's websites respectively, as provided, Eurex T7 Release 15.0, and GE DBoerse T7 Release 15.0.
  • Aug. 24, 2026 T7 15.0 Requirements Reminder
  • On Aug. 24, 2026, Eurex, GE DBoerse issued reminder re changes to Algo ID solution, the Common Upload Engine (CUE) validations for Short Code ID, and Algo ID uploads.
  • Also, enhanced Short Code ID and Algo ID error reports, which will be introduced with T7 Release 15.0 on Nov. 9, 2026, as published in Circulars 037/26 and 027/2026.
  • Further details and guidance are provided in the Eurex MiFID II/MiFIR page including impact on derivatives, and GE DBoerse MiFID II/MiFIR page including reporting.
  • Eurex and GE DBoerse encouraged trading participants to test/familiarize themselves with new requirements, as per simulation Aug. 31, 2026, and production Nov. 9. 2026.
  • Sep. 2026 Readiness Statement
  • On Sep. 29, 2026, Eurex, GE DBoerse issued Readiness Newsflash | T7 Release 15.0: Readiness Statement is available on publication of Release 15.0 Readiness Statement.
  • For the submission, the dedicated Trading PIN is required, which is available via the Member Section, and this is accessible to central coordinators and their deputies only.
  • Eurex, GE DBoerse also reminded users to participate in simulation environment and connection test to ensure a smooth transition, which are crucial for implementation.
  • Trading participants, Registered independent software vendors (ISVs) and Third party information providers (TPIPs) should submit a Readiness Statement by Oct. 30, 2026.
Regulators
Eurex; GE DBoerse
Entity Types
B/D; Corp; Exch
Reference
PR 9/29/2026; PR 8/24/2026; PR 8/21/2026; Cir 037/26, Cir 027/2026, 6/16/2026; Cir 026/26, Cir 018/2026, 5/6/2026; MIFID/MIFIR Dir 2014/65, Reg 600/2014
Functions
Compliance; Reporting; Risk; Trade Reporting; Trading
Countries
EU Exchange
Category
State
N/A
Products
Corporate; Derivatives; Equity; Fixed Income; Issuance/IPO; Securities
Rule Type
Final
Regions
EMEA
Rule Date
May 6, 2026
Effective Date
Nov 9, 2026
Rule ID
296921
Linked to
N/A
Reg. Last Update
Sep 29, 2026
Report Section
EU